A car wash with 150 kWp above the wash bays. Eleven miners on one MINEOMATBOX PRO, ten of them water-cooled – the power comes from its own roof, and the waste heat warms the wash water.

Car wash · heat recovery · Germany

A car wash in Germany: Eleven miners on one box – the waste heat washes cars

At a glance

PV
150 kWp
Battery
50 kWh
Miners
11 · 10 of them water-cooled
Mining power
up to 51.6 kW
Box
PRO

The story behind it

Eleven miners that wake up one after another.

A car wash is an unusually good place for surplus mining. Above the wash bays, 150 kWp sit on a canopy – translucent modules that give shade in summer and let enough light through in winter. Underneath runs a business that needs two things at once: electricity and hot water. That is exactly what the system delivers.

Eleven miners are connected to a single MINEOMATBOX PRO: six S19 XP+ Hydro, two S21e Hydro, two Whatsminer M53 Hydro – and one Avalon Q, the only air-cooled unit. Four device types from three manufacturers, industrial hydro technology next to a small home device, all on one controller. Plus a 50 kWh battery.

The interesting part is not the size but the daily routine. In the morning, not a single miner is running. As soon as the sun delivers more than the business needs at that moment, the box starts the first one. If the surplus is enough for the next, the next one joins – device by device, spread across the morning. In the afternoon it runs in reverse: miner by miner goes back to standby until, in the evening, they have all stopped again. Nobody sits next to it flipping switches. The box decides afresh every 30 seconds, based on solar production, the business’s consumption, battery level and spot price.

Because ten of the eleven devices are water-cooled, their waste heat is not lost as hot air but goes into the water: around 40 °C flows into the miners, around 49 °C comes back out. The car wash needs this heat anyway – for the wash water in summer, for the heated wash bays in winter. Electricity that would otherwise have gone into the grid for a few cents thus becomes two things at once: Bitcoin and process heat.

How well this works is shown by the figures since commissioning on 10 August: the eleven miners take in almost twice as much electricity as the business the system was built for in the first place – the numbers are just below.

From day-to-day operation

87 per cent is used on site.

Since commissioning on 10 August 2026: 9,992 kWh of solar generation – 5,606 kWh of it into the eleven miners, 3,105 kWh into the car wash itself, only 1,283 kWh into the grid. Self-consumption rate 87%.

Monthly balance
Balance 10–27 August 2026 · real figures from the control room

From the interface

What the operator sees.

Screenshots taken directly from this system – from the interface that runs locally on every MINEOMATBOX.

Live energy flow – 96.3 kW of solar, 51.6 kW of it going into eleven running miners
Live energy flow – 96.3 kW of solar, 51.6 kW of it going into eleven running miners
Daily curve: the miners are switched on one after another and taken back in the evening
Daily curve: the miners are switched on one after another and taken back in the evening
Miner overview – every device with hashrate, power and operating mode
Miner overview – every device with hashrate, power and operating mode
Keeping an eye on the water circuit: 40 °C in, 49 °C out – the heat stays on site
Keeping an eye on the water circuit: 40 °C in, 49 °C out – the heat stays on site

On site

Photos of the system.

Water-cooled miners in the plant room – right next to the heating manifold
Water-cooled miners in the plant room – right next to the heating manifold
Open cabinet – two Whatsminer M53 Hydro above the heat exchanger
Open cabinet – two Whatsminer M53 Hydro above the heat exchanger
More hydro miners in the outdoor cabinet – every device is connected to the shared water circuit with two hoses
More hydro miners in the outdoor cabinet – every device is connected to the shared water circuit with two hoses
Eleven devices from three manufacturers follow the same solar signal – and we need the heat it produces anyway.
The operator · Germany · translated from German
MINEOMATBOX PRO – product photo

Installed in this system

This system runs on the MINEOMATBOX PRO.

Controls up to 20 miners in order of priority – the most efficient one first. It runs locally in your home on Home Assistant, with no cloud and no subscription. If, contrary to expectations, the connection to your inverter doesn’t work, you can send it back.

€999.00 incl. VAT, plus shipping · Shipped from Austria · up to 20 miners

For a family home, the MINEOMATBOX HOME is usually enough: up to 8 miners, €499.00 incl. VAT, plus shipping. View HOME